When is certified payroll required?
The Davis-Bacon and Related Acts generally apply to federal and federally assisted contracts over $2,000 for construction, alteration or repair. If your subcontract sits under one of those prime contracts, you owe the prevailing wage in the wage determination attached to it, and you owe a certified payroll for every week you have people on the job.
Many states have their own prevailing wage laws for state and local public work. Their thresholds, rates, forms and filing systems differ from the federal ones and from each other. California, for example, has contractors on public works file certified payroll electronically with its Labor Commissioner, and filing it with the prime or the awarding body does not count. Check the law of the state the job is in, and the contract, before the first payroll.
What goes on form WH-347?
The Department of Labor’s form has a page of workers and a signed Statement of Compliance. Using the form itself is optional, but any other format has to carry the same information and the same statement word for word.
- The project, contract number, payroll number, week ending date and wage determination number.
- Each worker’s name and an identifying number: the last four digits of the social security number or another number unique to that worker, never the full SSN.
- Journeyworker or registered apprentice, with the apprentice’s level in the program.
- The labor classification from the wage determination for the work actually done, with hours split by classification when a worker does more than one kind of work.
- Straight time and overtime hours for each day, and the total for the week.
- The hourly rate paid, the fringe benefit credit, and any cash paid in place of fringe benefits.
- Gross earned on this project and on all work that week, deductions, and net pay.
Who files it, and when?
Every covered contractor and subcontractor fills one in each week. Subcontractors send theirs to the prime contractor, and the prime is responsible for passing all of them to the federal agency, or to the owner or sponsor that keeps the records when the agency is not a party to the contract. The DOL’s guidance puts the deadline at seven days after the regular pay date for that week.
The Statement of Compliance is signed by the person who paid or supervised the payment of the workers. A valid electronic signature is accepted. A pasted or scanned signature is not. Copies are kept for three years after all the work on the prime contract is complete.
How do fringe benefits and overtime work?
A wage determination gives each classification a basic hourly rate and a fringe benefit rate. You can meet the fringe part by paying into bona fide plans such as health or pension, by paying it as cash on the check, or by a mix of the two. Fringe is owed on every hour worked.
Overtime over 40 hours in a week is paid at one and a half times the basic rate, not the basic rate plus fringe. Cash paid in place of fringe benefits is not part of the overtime calculation.
A worked example
An electrician on a made up wage determination: $48.50 basic rate and $22.30 fringe. The shop pays $18.00 an hour into its health and pension plans and pays the other $4.30 in cash. The electrician works 44 hours this week.
| Line | Hours | Rate | Amount |
|---|---|---|---|
| Straight time | 40 | 48.50 | 1,940.00 |
| Overtime, 1.5 times basic | 4 | 72.75 | 291.00 |
| Cash in place of fringe | 44 | 4.30 | 189.20 |
| Cash wages for the week | 2,420.20 | ||
| Paid into plans | 44 | 18.00 | 792.00 |
The fringe check: 44 hours at $22.30 is $981.20 owed, and $792.00 into plans plus $189.20 in cash is $981.20 paid. The overtime premium is figured on $48.50 only.
Mistakes that cost money
- Paying the wrong classification. A worker doing two kinds of work needs hours split between them, or the higher rate applies to every hour.
- Multiplying fringe by 1.5 on overtime, or leaving it off overtime hours. Fringe is owed on every hour, at the straight rate.
- Late or missing weeks. On direct federal contracts the contracting officer can withhold payment from the contractor until the missing payrolls are submitted.
- Using the federal form on a state job that wants its own system or format.
A note on the law
This is general information, not legal advice. Your contract, the wage determination and the law of the state the job is in decide.